LogiFindex
GuideLoading metreLDMPartial loadGroupage

You Use a Third of the Truck and Pay for All of It: What Not Knowing Loading Metres Costs You

By LogiFindex TeamNov 20, 2026Last updated: Nov 20, 20267 min read
You Use a Third of the Truck and Pay for All of It: What Not Knowing Loading Metres Costs You

A loading metre (LDM) is one metre of trailer length across the full width (about 2.4 m). A europallet (120 × 80 cm) takes 0.4 LDM, so 10 europallets ≈ 4 LDM - about 29% of a standard 13.6 m trailer. If you book a full truck for that load out of habit, you pay for the 71% you do not use. Partial (groupage) freight is priced per LDM, with 1 LDM usually counted as about 1,750 kg - whichever is higher, space or weight, is billed.

"We always send a full truck, it is simpler." It is simpler. It is also, very often, two or three times the price the load needs.

The reason is one number most shippers never calculate: the loading metre.

What Exactly Is a Loading Metre?

A standard semi-trailer is about 13.6 m long and 2.4 m wide inside. One loading metre (LDM) is one metre of that length across the whole width - roughly 2.4 m² of floor.

Partial freight across Europe is priced per LDM because floor is what a load really takes away from the truck: once a pallet is on the floor, nothing else can stand there.

The Formula

LDM = (length × width of the load, in metres) ÷ 2.4

Common pallets, not stackable:

PalletSizeLDM per palletPallets per 13.6 m trailer
Europallet120 × 80 cm0.4about 33
Industrial pallet120 × 100 cm0.5about 26
Half pallet80 × 60 cm0.2-

If your goods can be stacked two high, the floor they take - and the LDM you are billed - roughly halves. That is why a "non-stackable" flag on a booking costs real money.

The 1,750 kg Rule

Space is not the only thing carriers sell; they sell weight capacity too. So partial freight is usually billed on chargeable weight, where 1 LDM ≈ 1,750 kg (some carriers use other factors - check yours):

  • Light, bulky load: 10 europallets × 400 kg = 4,000 kg real. Space = 4 LDM × 1,750 = 7,000 kg. Billed as 4 LDM - you pay for the floor.
  • Dense, heavy load: 10 europallets × 1,000 kg = 10,000 kg real. 10,000 ÷ 1,750 = 5.71 LDM billed, even though the pallets only cover 4 LDM of floor.

Worked Example: What the Habit Costs

Illustrative rates for Istanbul → Berlin, the same ones used in our FTL vs LTL guide: €240 per LDM groupage, €3,200 for a full tautliner. They show the method, not today’s market.

Your loadLDMGroupageFull truckYou overpay with a full truck
6 europallets, 2.4 t2.4€576€3,200€2,624
10 europallets, 4 t4.0€960€3,200€2,240
16 europallets, 8 t6.4€1,536€3,200€1,664

Ten pallets on a full truck means paying for 13.6 LDM to move 4. That is the "third of the truck, full price" trap.

A full truck is still the right call in some cases: a hard delivery deadline, fragile or high-value goods, ADR or temperature control, or past roughly 8-9 LDM, where the price gap closes.

Five Mistakes That Inflate Your LDM

  1. Declaring "non-stackable" by default. If your cartons can take another pallet on top, say so - it can halve your bill.
  2. Wrong pallet type. A 120 × 100 industrial pallet is 0.5 LDM, not 0.4. Ten of them are a full metre more.
  3. Overhang. Cartons sticking out past the pallet edge enlarge the footprint you are charged for.
  4. Rounding up. Many carriers round to the next 0.1 or 0.5 LDM. Ask how they round before you compare quotes.
  5. Ignoring weight. Dense goods (tiles, metal, liquids) are billed by weight; packing them more tightly saves nothing.

Calculate Before You Book

Our free Loading Metre Calculator turns your pallets into LDM, shows how much of a trailer you use and which vehicle fits. Then publish the load once on LogiFindex and compare partial and full-truck quotes side by side - 0% commission.

Frequently Asked Questions

What is a loading metre (LDM)?

One metre of trailer length across the full width, about 2.4 m of width. A standard 13.6 m trailer has about 13.6 LDM. Partial road freight in Europe is usually priced per LDM.

How do I calculate loading metres?

Multiply the length and width of the load in metres and divide by 2.4. A europallet (1.2 × 0.8 m) is 0.4 LDM; an industrial pallet (1.2 × 1.0 m) is 0.5 LDM. If goods can be stacked two high, the LDM roughly halves.

How many europallets fit in a 13.6 m trailer?

About 33 non-stackable europallets, or about 26 industrial pallets (120 × 100 cm).

What is the 1,750 kg rule?

Many carriers count 1 LDM as about 1,750 kg of chargeable weight and bill the higher of space and weight. Light bulky loads pay for floor space; heavy dense loads pay for weight. The factor can vary by carrier.

When should I book a full truck instead of a partial load?

Usually past about 8-9 LDM, or when there is a hard deadline, fragile or high-value goods, ADR or temperature-controlled cargo. Below about 4 LDM a partial load is almost always cheaper.

Ready to put it into practice?

Post your load on LogiFindex and collect competing quotes from carriers, insurers and customs brokers - free during early access, 0% commission.

Create a free account